Project 4 - B650 DEMO AND ASBESTOS ABATEMENT, VA Palo Alto, CA

Published in Construction

BVB CONSTRUCTION INC.

PROJECT 4

  1. PROJECT OWNER: 

DEPARTMENT OF VETERANS AFFAIRS – SIERRA PACIFIC NETWORK

  1. CONTRACT NUMBER: 

VA261-C-0639

  1. TITLE: 

B650 DEMO AND ASBESTOS ABATEMENT

  1. DOLLAR AMOUNT: 

$574,927

  1. MONTH AND YEAR PROJECT WORK COMMENCED AND COMPLETED: 

PROJECT START DATE:  JUNE 2009

PROJECT COMPLETION DATE:  OCTOBER 2009

  1. LOCATION: 

10535 HOSPITAL WAY

MATHER, CA 95655

  1. POINT OF CONTACT AND TELEPHONE NUMBER: 

CONTRACTING OFFICER:  THOMAS HART

(916) 923-4514  

EMAIL:  Thomas.hart2@va.gov

CONTRACTING OFFICER TECHNICAL REP:  STEVEN HAMILTON

(916) 843-9129

EMAIL:  Steven.hamilton@va.gov

DESCRIPTION OF PROJECT:

Type: Demolition and Removal of Hazardous Materials

Contract Award Amount: $574,927

Contract Completion Amount: $574,927

Size: Demolition and abatement over a 30,000 SF area.

Scope of work included general demolition of interior including demolition of walls and ceilings, floor finishes, plumbing fixtures and piping, electrical wiring, lights, telecommunication cabling, terminal units, ductwork, grilles and diffusers and similar systems and equipment. Project included all activities associated with the removal and disposal of ASBESTOS CONTAINING MATERIALS. Project also included all costs associated with capping and/or rerouting existing plumbing lines, ductwork, termination of electrical wiring, as some of these systems served adjacent floors and were protected and remained in service.

Similar Projects

■ Southern Arizona VA Health
Care System, Tucson, AZ

BVB renovated room 2D153 located in the operating suite Cysto room 1 from its current use as bathroom to a storage closet. BVB removed all existing plumbing fixtures and patched walls and floor.

Published in Business News

Read more

■ VA Livermore Division,
Livermore, CA

BVB updated the ceiling in the room to meet the current Operating Theater requirements. BVB also removed the existing suspended ceiling and all related components to include the existing lighting fixture(s).

Published in Business News

Read more

■ VA Pacific Islands Healthcare Systems, Honolulu, HI

BVB replaced the existing flooring after the fixtures and floor repairs are made. BVB also provided a sound, clean and level surface to apply flooring in accordance with flooring manufacturer’s instructions and specifications.

Published in Business News

Read more